batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

What is matter ? .......................​
3 spelling errors. It would be hard to find a European city that has a worse reputation than Bartovia, with crime, rubbish, graffiti, and deralict buildings fe
what are the role of federal government?​
Why does someone have any sensation below their shoulders?
why was anne Frank's parent so lenient towards her? ( mentioned in her diary September 27,1942)​
what was the heart and soul of greek society?
An open tank contain oil of specific gravity 0.75 on top of water. If the depth of oil is 2m and the depth of water is 3m. calculate the gauge and absolute pres
Which is a long-term consequence of an injury? a few missed days from work or school the need for physical therapy and rehabilitation some temporary discomfort
The debt to tangible net worth ratio is calculated as follows: (Equity - Intangible Assets) / Interest Bearing Liabilities Interest Bearing Liabilities / Equity
You are working as a back office Medical Assistant, and have just performed a TB test on a patient who needs the test for employment verification. The patient