liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

1) fought at Lexington and Concord 2)a formal meeting called for a special purpose 3) complaints against British rule 4) formed to solve the problem of trade
which has the least absolute value?A. 5B. 30C. -10D. -50
A mountain climber camped at an elevation of 18,492 feet. the following day the climber descended 2,516 feet to another campsite. Type a numerical expression
Which three countries have the least access to technology?
how to solve 0.01x+0.07y=0.22 and 0.03x-0.05y=0.14 by substitution
Convert 14mm to its equivalent in m using dimensional analysis
tanisha ran 3/5 of a 26 mile race in 3.2 hours.if she ran at a constant rate,what was her speed in miles per hour?
What is the most dense thing in the world
373 of 500 in fractions and decimal
Estimate each quotient using compatible numbers.