katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

4 divided by 1/2 equals what
what is the estimate of 324867 plus 6233
What does ¿El Día de San Valentín es el trece de enero? mean?
Which is a characteristic of various kinds of world map projections? A. They cannot include enough detail to be useful. B. They distort scale and landmas
Identify five Native American loan words
81.098 rounded to hundredths
What is the expanded form of 249,104,330
What is 5? A prime Or composite?
19/20 as terminating decimal
you've located three books on a topic you;re researching for an essay. The first thing you should do in determining if any of these books will be useful