fosterjoseph5716 fosterjoseph5716
  • 02-05-2021
  • Mathematics
contestada

If six girls can finish sweeping the floor of a hall in 45mins,how long will the same work take ten girls to do

Respuesta :

cmckee660
cmckee660 cmckee660
  • 02-05-2021

Answer:

15 minutes i think

Step-by-step explanation:

45÷6=7.5

meaning 7.5 minutes per girl

so 4 girls would be 30 minutes of work

so 45-30=15

Answer Link

Otras preguntas

If x represents the first, or smallest, of three consecutive odd integers, express the sum of the three integers in terms of x
The competition between the United States and the Soviet Union after World War II was called the A. Twentieth Century War. B. Ideological Conflict.
why does eastern Norway have colder and snowier winters than western Norway?
The length of a rectangle is 3 meters less than twice the width. if the area of the rectangle is 464 square​ meters, find the dimension
What is the solution to the compound inequality 5x + 7 > −8 and 3x + 7 ≤ 19? A. x ≤ −3 and x ≥ 4 B. −3 ≤ x < 4 C. x > −3 and x ≥ 4 D. −3 < x ≤ 4
Why is the amoeba considered an outgroup in this cladogram?
In which type of muscular contraction does the muscle change length either shortening or lengthening?
Which of the following bonds is the strongest? H-F C-CI C=O N≡N
the graph shows the high temputure on july 4th over a 15 year
If possible, find the area of the triangle defined by the following: a = 1.2, c = 2.1, β = 5°.