nataliaalonso36
nataliaalonso36 nataliaalonso36
  • 02-12-2016
  • Mathematics
contestada

A painter painted about half a room in half a day. Coley estimated that the painter would paint 7 rooms in 7 days. is coley's estimate reasonable?

Respuesta :

harmypantz harmypantz
  • 02-12-2016
It is 14 estimate Washington
Answer Link
Vidal1 Vidal1
  • 02-12-2016
no, because he should have the other half of the day to sleep or whatever. he should have 14 days
Answer Link

Otras preguntas

Which of the following is an example of a GAAP standard? Ensuring financial statements are accurate and complete Ensuring products meet all quality standards
Simplify 5/8+9/2+(-4/5)+7/8+(-5/2)+7/5please answer​
75m X A car moves with a uniform velocity 21 ms-1 from position P and a truck moves from rest with uniform acceleration 2 ms-2 from position Q in the same time
Find the slope of the line.
Which two of Shakespeare's plays are entirely written in verse?
what is linear relationship ​
How do the words forged and nurtured affect the meaning of this passage
What does this quote mean?
Work out the coordinate of R​
Essays and paragraphs have a very different structure.