Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

How many hours are 180 minutes
A curved section of roadway is in the shape of a circular arc of 410-m radius. The curved section is horizontal, not banked. The coefficient of friction for tir
where did japan first expand its empire after 1930
find a common solution for each system of equations: y=3x+5 y=-5x-3
Please answer:If a stadium holds 60000 people.1. If the stadium is 2/3 full, how many people are there?2. If the stadium is 3/4 full, how many people are there?
How is 3x-y=8 and x+2y=5 solved by combination (addition)?????
Perimeter of a square with an area of 81cm2
Hello, I need help please for mission 3 thank you very much.
Earth is a close approximation of a natural closed system.  What are some ways that living in a closed system affects each of us.
What number is equivalent to 13/2