alexslayer44
alexslayer44 alexslayer44
  • 01-12-2021
  • Mathematics
contestada

Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

when does the velocity and speed of a moving body becomes identical?
The Gleason family has a monthly budget of $4,500. Mr. Gleason has a full time job and takes home $900 each week. Mrs. Gleason works part time and brings home $
Read the paragraph. How was the 20th Maine Regiment instrumental to winning the Battle of Gettysburg? Its members recognized the strategic importance of holdin
What are two main languages families to which most languages spoken through tout Europe can be traced
I really Need help with number 2 plz asap
A school conducted a survey to find out which games students enjoy watching the most. This two-way table contains the results of the survey. Which game do eleme
Which statement is true? A triangle can be congruent to a square. A rectangle can be congruent to a square. All circles are congruent. None of the above is true
Which planets are the most dense
If the sum of the measures of the interior angles of a convex polygon is 2160°, how many sides does the polygon have?
What are the like terms of 4p 3q-3p-3q?