ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

A small-appliance circuit will be protected by a circuit breaker rated at A. 15 A. B. 20 A. C. 30 A. D. 50 A.
What is malaria? a. a tropical disease caused by a parasite b. a disease caused by misshapen white blood cells c. a common heterozygous genetic variation d. a c
Only four people can serve on a committee. how many committees can be selected from a group of 6 people
There are 12 (blank) in the United States, which (blank) from the district courts
Table salt is formed when an electron is transferred from a sodium atom to a
The coordinate notation for a translation 5 units right and 6 units down is?
Which early 1900s group is best characterized by this list? • Overcrowded tenement apartments • Dangerous working conditions • Segregated ethnic neighbor
Find the quotient #Algebra2
Wolves and other canids have adapted to have very specialized oral anatomy. They have short incisors in the front; long, sharp canines next to the incisors; and
A __________ change occurs when the bonds between atoms or molecules change and a new substance forms. nuclear permanent physical chemical