Karla12346 Karla12346
  • 03-12-2015
  • Mathematics
contestada

a shop produces 39 wet suits every 2 weeks. how long will it take the shop to produce 429 wet suits?

Respuesta :

CheeseQueen21
CheeseQueen21 CheeseQueen21
  • 03-12-2015
429 ÷ 39= 11 11 ÷ 2= 5.5 (5 1/2) It takes 5 1/2 weeks to produce 429 wetsuits
Answer Link

Otras preguntas

1. What operations would you use in order to solve 3x – 4 = 26. Please write the operations in the order you would use them.
The coolest and dimmest space objects emit radiation of longer wavelengths than those we can see. A detector for which type of electromagnetic radiation is most
Calculate the moment of inertia of a bicycle wheel 66.7 cm in diameter. the rim and tire have a combined mass of 1.25 kg. the mass of the hub can be ignored sin
*The hunger games * I need help with both of these please
Line ET is tangent to circle A at point T and the measure of angle TNG is 35.
Aisy works at an ice-cream parlor. She is paid $10 per hour for the first 8 hours she works in a day. For every extra hour she works, she is paid 1.5 times her
solve (x+y)^2+(x^2+2xy+y^2) and show your work
In circle F, the measures of angle ARE equals 120 and the measures of arc BD equals 50. What is the measure of angle C?
WILL GIVE BRAINLIEST!! NEED HELP WITH THIS. GEOMETRY/REFLECTIONS/TRANSLATIONS
Can I please have the answers.