In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

A student was testing to see if hummingbirds are drawn to the color red. She hung 4 hummingbird feeders in a tree (one red, one blue, one green, one yellow). A
The ratio of boys to girls in homeroom is 2:3 if there are 8 boys how many girls are there?
Julio bought soccer shoes at a 35% off sale ans saved $42. what was the regular price of the shoes
Determine if the segment X is half the length, double the length, two thirds the length, or the same length as segment Y. X is half the length of Y X is double
The private papers of what scientist had to be decontaminated for two years in the 1990's before being put on file at the National Library in Paris? 577 points
Dell obtains most of its computer parts and chips from other manufacturers and assembles them together into a desktop or a laptop, which is then sold to consume
why was the 54th massachusetts regiment famous
Why were the first factories more efficient than the earlier putting out system?
According to empedocles, what two primary forces move the four basic elements that compose our universe?
Indicate whether (1, 5) is a solution of the given system. HELP ASAP!! y≥ 4x, y<x+2